Case Studies

Midwest based top tier retailer with 1,800 nationwide locations across the United States.

 

 

 

UPS Server Room Power Upgrade

Completed a National roll-out of UPS power upgrade in each stores server room to support high capacity UPS. Completed roll-out in 1200 stores in 12 weeks.

Electrical and Technology Services:

 

  • Performed multiple site surveys to define ideal approach to the project scope.
  • Developed an Electrical System Capacity Flow Chart to support each installation
  • Installed a new electrical circuit outlet to server room
  • Installed 3 new circuits/receptacles, 1- 208VAC & 2- 120VAC, in the server room of each store

 

Blu Ray

National roll-out of new retail floor consumer media display replacing one exiting monitor with two new LCD monitors and a flash media player. Completed roll-out in 800 stores in 19 weeks.

Electrical and Technology Services

  • Installed 2- 3 2” LCD displays
  • Installed 1 new 120v receptacle
  • Installation and connection of flash media player
  • Relocated and rewired existing audio system.
  • Connected and tested all equipment installed

TV Wall

National roll-out of television display area remodel to accommodate flat screen televisions instead of larger/older tube models. Increase shopping aisle width to better utilize the floor space for foot traffic and video game end cap. Completed remodel in 600 stores over a 10 week period of time.

Electrical and Technology Services

  • Provided upgraded power for televisions being displayed
  • Installed multiple monitors
  • Connected and tested AV
  • Modified existing fixtures
  • Managed all procurement and logistics
  • Performed all work during the middle of the night while store is closed